
Model Overview & Print Notes
Festive Signpost, fits 256x256x256 build plate Printing and Assembly Instructions Important Information – Please Read Carefully Before starting assembly, please read through these instructions to familiarise yourself with the parts and how they fit together. Lettering and Sign Borders All lettering has been hand-drawn, so there may be slight variations between individual letters. The lettering for each sign has been arranged exactly as it should appear on the finished signboard. Please take extra care when removing the letters from the build plate to ensure they remain in the correct order and position. The arrow-shaped sign borders are also hand-drawn, meaning there may be slight differences between the left- and right-facing versions. Make sure you match the correct border to each sign. I recommend completing one sign at a time to avoid mixing up the lettering and decorative parts. Glue and Assembly Glue is required for the final assembly, including attaching the lettering, decorations, borders and completed signs to the candy cane sections. However, the candy cane sections do not need to be glued to the main pole. This allows the signpost to be disassembled for easier storage. Numbered Parts Both the main pole and candy cane sections are numbered to ensure they are assembled in the correct order. * The main pole starts with Part 1. * The candy cane sections also start with Part 1. * Continue assembling both sets of parts in numerical order. It is important that all numbered parts are assembled in the correct sequence to ensure everything fits and aligns properly. Weighted Base The base includes a built-in cavity that can be filled with sand or another suitable weighted material to provide additional stability. * Adding weight is optional. * If adding weight, ensure the cavity cover is firmly pressed into place. * The cover has a slightly longer lip on one side, so make sure it is fitted in the correct orientation. * The base has been designed to print without supports. Sign Placement The signs can be arranged in whichever order you prefer, with one exception: Santa's Workshop must always be the top sign. Multicolour Parts There are two multicolour decorative parts: * Gingerbread Man * Chef's Hat These can be printed using a multicolour printer. Alternatively, if you have a single-colour printer, you can achieve the colour changes by using layer-height colour swaps. Small Parts Some of the lettering and decorative elements are quite small. Please take extra care when removing these from the build plate to avoid damaging or losing any pieces. Printing Recommendations Recommended Print Settings * Layer Height: 0.2 mm * Infill: 8–15% * Supports: Not required. The model has been designed to print without supports. Filaments Used The following Bambu Lab filaments were used: * Maroon Red * Mistletoe Green * White * Gold * Matte Latte Outdoor Use For outdoor displays, I recommend using PETG for improved weather resistance. In hotter climates, ABS or ASA may be more suitable. PLA is best suited to indoor use, as prolonged exposure to heat and direct sunlight can cause deformation. Assembly Instructions Step 1 – Prepare the Base Start with the base. If you wish to add weight, fill the internal cavity with sand or another suitable weighted material. Once filled, firmly press the cover into place, ensuring it is correctly orientated. Remember that the lip is slightly longer on one side. If you are not adding weight, simply fit the cover without filling the cavity. Step 2 – Attach the First Pole Section Take Pole Part 1 and screw it into the base. Ensure it is securely fitted before continuing. Step 3 – Attach the First Candy Cane Section Take Candy Cane Part 1 and slide it down over the pole. As you look at the front of the signpost, the number on the candy cane section should be positioned on the left. You will also notice a small guide nub. This fits into the corresponding slot on the adjoining section and prevents the candy cane from rotating. Make sure the guide nub is correctly aligned before sliding the section fully into position. Step 4 – Continue Building the Pole and Candy Cane Continue adding the remaining candy cane sections in numerical order. Once the current pole section is filled, screw on the next numbered pole section and continue adding the corresponding candy cane parts. Repeat this process, working upwards, until all pole and candy cane sections have been assembled. Remember: Both the pole and candy cane sections must be assembled in the correct numerical order. Step 5 – Attach the Pole Top Once the main pole and candy cane sections are complete: 1. Screw the pole top into position. 2. Slide the decorative snow top into place. The main signpost structure is now complete. Sign Assembly Step 6 – Prepare the Lettering I strongly recommend working on one sign at a time. Select the signboard you wish to assemble, along with its corresponding lettering and decorative elements. Carefully remove the lettering from the build plate, maintaining the original layout and order. Remember that the lettering is hand-drawn, so individual letters may have slight differences. Step 7 – Attach the Lettering and Decorations Position each letter onto its designated signboard. Once you are happy with the placement, glue each letter into position. Next, attach the small decorative elements associated with that sign, securing them with glue. Take your time with this stage to ensure everything is correctly positioned. Step 8 – Attach the Sign Border Select the correct arrow-shaped border for your sign. Remember that the borders are hand-drawn and may differ slightly between left- and right-facing signs. Carefully position the border onto the signboard and secure it with glue. Repeat Steps 6–8 for each of the remaining signs. Final Assembly Step 9 – Attach the Sign Connectors Once all the signs have been completed, take the corresponding connectors and glue them into the designated slots on each sign. Allow the glue to set sufficiently before attaching the signs to the main structure. Step 10 – Attach the Signs to the Candy Cane Sections Each sign attaches to a candy cane section with a corresponding connector slot. Apply glue and carefully fit the sign connector into the slot on the candy cane section. You can arrange the signs in whichever order you prefer, but Santa's Workshop must be positioned at the very top. Continue attaching the remaining signs until your festive signpost is complete. Assembly Complete! Congratulations! You have successfully completed your Festive Signpost. Your signpost is now ready to become part of your Christmas display. If you have chosen not to glue the candy cane sections to the main pole, the signpost can be carefully disassembled for easier storage after the festive season. Thank you for printing, and I hope you enjoy your Festive Signpost!






💬Thangs Community Comments(1)
★Thangs Original Reviews